Date - Customer, Job Name, Job Location, Job State. Description of work.
Last Update: Nov.  2008
11/2008 - 12/2008, Claremont, CA. SCE, Live Oak Substation.
Replacement of 12KV IPS bus and cable conductor using DMC compression systems (Designed Metal Connections). Included replacement of approx. 988 feet of IPS to 3-1/2 IPS and 1272 SAC with hookstick disconnects for inner & outer operating bus and transfer bus.

09/2008 - Present City of Pasadena, CA.
Two year contract, time & equipment substation maintenance, indefinite quantity.

05/2008-10/2008 - Rancho Cucamonga , CA. McGrann Papers West.
Relocation of paper rewinding plant, including installation 800A distribution switchgear, all branch circuit conduit and conductors and motor installations. Subcontractor: ASI.

02/2008-08/2008 - Monolith , CA. SCE, Monolith Substation.
Modify 66KV-12KV substation. Included installation/modification of 66KV steel bus rack, extension of 66KV IPS bus and installation of new 66KV circuit breaker for bus tie position. Erection of steel dead-end structures for two transformer positions, installation of two 66/12KV 14MVAtransformers, including 66KV disconnects and aerial bus spans. Included 12 position 12KV distribution rack, including installation of 12KV circuit breakers, steel erection, 3-1/2 inch IPS, 1590 ACSR, 1272 SAC & rope-lay bus. Included all above grade conduit, grounding and field wiring for power, lighting and controls. Included over 100 multi-conductor cable pulls and field termination of same. Ultra Welding subcontractor.

12/2007-02/2008- Murrieta, CA. SCE, Murrieta Substation.
Install two power transformers, extend wood bus structure, replace, extend and upgrade bus. Install group operated and hookstick disconnects. 12KV 33KV. Included all associated civil foundations, below grade conduit, control cabling and grounding, above and below grade.

12/2007-10/2008- Highland, CA. Subcontract, Cunningham Davis Corp.
SCE, Hydro Division, Seven Oaks Dam. Installation of electrical circuits for sump pumps, conveyor systems and outdoor lighting.

08/2007-9/2007- SCE, Mohave Generating Substation, Laughlin, NV. Replace 500KV group operated disconnects. Included dismantling of existing disconnects, modification of existing steel structures, installation of new switches and grounding blades and mechanisms including all above grade grounding and conductoring.

04/23/07-6/1/07- SCE, Victor Substation, Victorville, CA. Increase capacity. 12KV bus rack extension & capacitor rack installation. Included installation of two 12KV circuit breakers, one capacitor rack and all associated conductoring, steel support structures, control wiring and above grade conduit & grounding, and high and low voltage connection of new 115/12KV transformer bank.

04/15/07-4/29/07 - SCE, Tennessee Substation, Yucaipa, CA. 66KV rack extension. Installation of 6KV Rack steel, lightning arresters, circuit breakers and potential transformer.

01/15/07-5/15/07- SCE, Rivertex Substation, Oro Grande, CA. Construction of new 115KV/13.8KV Substation for TXI Concrete Plant. Erect & install equipment for new 115KV rack including disconnects & circuit breakers, aerial conductors, 115/13.8KV parallel banks, two parallel 3.8KV racks, one 13.8kv line circuit breaker and associated equipment, control wiring, grounds and conductors. This project also included installation of control panels and control house wiring under customers test supervision.

11/20/06-12/15/06- SCE, Ravendale Substation, San Gabriel, CA. Remove retired 16kv capacitor bank and associated equipment and disassemble for salvage. Assemble and install new 16kv capacitor bank, circuit breaker and associated equipment, cable grounds and conductors.

10/23/06-12/8/06- SCE, Walnut Substation, City of Industry, CA. Remove and replace (6) 66kv circuit breakers, foundations, conduit, grounding, control cable and field control wiring.

10/30/06-11/8/06- SCE, Cardiff Substation, San Bernardino, CA. Replace existing 12kv bank disconnects, 18 each.

10/23/06-10/27/06- SCE, Del Rosa Substation, San Bernardino, CA. Relocate (3) single phase transformers with (1) new three phase transformer.

10/11/06-10/27/06- SCE, Calelectric Substation, San Bernardino, CA. Replace associated conductors 4 ea. Obsolete 115kv disconnects.

5/1/06-7/26/06- SCE, Sun City Substation, Menifee, CA. Install a new 115kv to 12kv substation including a (4) position 115kv switchrack, a (4) position 12kv switchrack, transformer bank, (1) 12kv capacitor bank and related electrical equipment, including all above grade conduit, grounding, bus conductoring and field control wiring. Included all MEER building equipment installation including relay racks, cable terminations, inner panel wiring, AC and DC distribution panels and associated electrical equipment.

1/16/06-6/1/06- SCE, Earlimart Substation, Earlimart, CA. Install (1) 66kv position, (1) 66/12kv bank, (7) 12kv position switchrack, (1) 12kv cap bank, demo old 12kv switchrack.

1/3/06-2/3/06- SCE, Vincent Substation, Palmdale, CA. Provide necessary supervision, labor, material, tools and equipment to perform electrical construction services within the entire Edison system on a Time and Material basis.

12/21/05-2/26/06- Cunningham-Davis Corp., Lytle Creek Fish Screens, Lytle Creek, CA. Lytle Creek Fish Screens, AC service, motors and sump pumps.
12/12/05-12/21/05- SCE, Bandini Substation, Los Angeles, CA. Remove and salvage all existing 4kv electrical equipment, including transformers, circuit breakers, disconnects, conductors, switch rack steel, above ground conduits and grounds, switchboard panels and support rack. Pull out and salvage all control cables from the 4kv switchrack area into the building.

10/20/05-11/18/05- SCE, La Fresa Substation, Torrance, CA. Replace (3) 220kv circuit breakers and associated foundations. Replace outside A/C lighting panel.

10/14/05-10/19/05- SCE, Smiley Substation, Redlands, CA. Install (6) single phase regulators in (2) 4kv line positions and related electrical work including minimal grounding and below grade conduits.

10/3/05-10/14/06- SCE, Zanja Substation, Yucaipa, CA. Remove and replace (2) 33kv breakers and related electrical work including foundations, and the relocation of a ground bank transformer.

4/27/05-5/6/05- SCE, Phelan Substation, Phelan, CA. Install one 12kv line position.

4/25/05-5/16/05- SCE, North Oaks Substation, Santa Clarita, CA. Install new wrap around bus with two new 12kv line positions and one 12kv spare position.

3/29/05-4/22/05- SCE, Shuttle Substation, Lancaster, CA. Install new wrap around bus with two new 12kv line positions one 12kv spare position. Remove two old sets of bank CT's and re-conductor.

3/14/05-3/28/05- SCE, Lancaster Substation, Lancaster, CA. Install one new 12kv line position.

2/8/05-3/11/05- SCE, Santa Susana Substation, Simi Valley, CA. Work includes the installation of one new 16kv line position.

1/24/05-2/1/05- SCE, Royal Substation, Simi Valley, CA. Provide the necessary supervision, labor, material and equipment to install one new 16kv line position.

1/24/05-1/27/05- SCE, Palmdale Substation, Palmdale, CA. Work included installation of one 12kv line position.

1/17/05-1/21/05- SCE, Elizabeth Lake Substation, Castaic, CA. Work included installation of one (1) new 16kv line position. 

2004- SCE, Olinda Substation, La Habra, CA. Replace three-phase and single-phase station light and power transfer switch. Replace 2 three-phase SL&P Circuit breakers in existing cabinets. Install new cable from switches.

11/22/04-1/27/05- SCE, San Bernardino Substation, San Bernardino, CA. Replace three-phase and single-phase station light and power transfer switch. Replace 2 three-phase SL&P Circuit breakers in existing cabinets. Install new cables from new switches.

9/7/04-12/2/04- SCE, Magunden Substation, Bakersfield, CA. Provide the necessary supervision, labor, material, tools and equipment to replace 220kv circuit breakers and other associated work.

7/26/04-8/27/04- SCE, Bailey Substation, Gorman, CA. Core and Grout Bolts.

6/21/04-6/25/04- SCE, Yucaipa Substation, Yucaipa, CA. Provide the necessary supervision, labor, material to perform  electrical work.

5/3/04-5/7/04- SCE, Shuttle Substation, Palmdale, CA. Provide the necessary supervision, labor, material, tools and equipment to install a 12kv line position and other associated work.

4/23/04-5/4/04- American Construction Services, Carmenita Substation, Carmenita Substation. Provide materials and labor to perform necessary electrical work.

4/22/04-5/10/04- Cunningham Davis Corporation, San Bernardino Sump Pumps, San Bernardino, CA. Install above grade conduit and grounding, power and control cables, control and power terminations, installation of sump pumps and control cabinets.

4/22/04-5/11/04- American Construction Services, Rio Hondo Substation, Rio Hondo, CA. Provide materials and labor to perform necessary electrical work.

2/17/04-3/14/04- SCE, Archline Substation, Rancho Cucamonga, CA. Provide the necessary supervision, labor, material, tools and equipment to increase substation capacity and other associated work.

1/19/04-5/10/04- SCE, Banning Substation, Banning, CA. Provide the necessary supervision, labor, material, tools and equipment to install ground banks, add current transformers to #1 bank, install pts SL&P transformers, lightning arrestors, bus support structures, bus, disconnects, Circuit breakers, reactors, conduit, grounding and steel poles.

11/4/03-4/23/04- City of Anaheim, Clair Substation, Anaheim, CA. Furnish and install grounding, conduits and boxes, control cables and wiring, high voltage busses and fittings. Construct foundation for circuit breaker, disconnect switch/insulator support, light pole and control cable trench. Mobilization and De-Mobilization. Demolish existing light pole footing. Transport, install and connect circuit breaker, disconnect switches, and bus support insulator.

10/6/03-11/6/03- SCE, Big Creek Substation No.2, Big Creek, CA. Disconnect existing breakers, furnish and install new conduits and termination boxes, install new disconnect switches, wire new breakers, reconnect high side drops and connect breaker to copper bus.

10/6/03-11/21/03- SCE, Goshen Substation, Goshen, CA. Provide the necessary supervision, labor, material and equipment to replace transformers and other related work.

10/3/03-12/19/03- SCE, Vista Substation, Grand Terrace, CA. Provide the necessary supervision, labor, material and equipment to remove and replace circuit breakers and other associated work.

9/23/03 - SCE, Sanitreat/Outfall Substation, Carson, CA. Demolition of existing substation (Sanitreat). Construction of new substation (Outfall) including assembly and erection of 66KV structural steel, new 66KV circuit breaker, new pedestal mounted potential transformers, new rack mounted current transformers. Installation of control cubicle, communications rack all associated above grade conduit, control wiring and grounding.

9/22/03-10/22/03- SCE, Redlands Service Center, Redlands, CA. Field Facility Infrastructure Upgrade. Electrical main switchgear.

8/13/03-9/17/03- SCE, Oasis Substation, Lancaster, CA. Install a transformer and other associated work at oasis substation.

8/7/03- SCE, Royal Substation, Simi Valley, CA. Provide the necessary supervision, labor, material and equipment to remove existing 2000/5 Capacitor Rack, Current Transformers with new 1200/5 CT's.

7/28/03-10/13/03- Mc Grann Paper Corporation, Pomona, CA. Modification of electrical system, to install paper plant for the building, structure or other work of improvement.

6/30/03-7/12/03- SCE, Hopeful Substation, Duarte, CA. Install a transformer and other associated work.

6/23/03-6/27/03- SCE, Banning Substation, Banning, CA. Provide the necessary supervision, labor, material and equipment to remove existing Capacitor Bank.

6/23/03-6/27/03- SCE, Highland Substation, Highland, CA. Provide the necessary supervision, labor, material and equipment to install conductor, flat bar and new critter guard according to prints.

5/2003- SCE, Thousand Oaks Substation, Thousand Oaks, CA. Provide the necessary supervision, labor, material and equipment to replace one (1) old GE 66kv circuit breaker with new ABB 66kv circuit breaker.

4/25/03-5/3/03- SCE, Declez Substation, Fontana, CA. Provide the necessary supervision, labor, material and equipment to remove and replace conductor on the No.1 north and south transformer units.

4/9/03-4/14-03- SCE, Wimbelton Substation, Ontario, CA. Provide the necessary supervision, labor, material and equipment to install 24 each 12kv disconnect switches. Install conductoring in two (2) line positions.

4/7/03- SCE, Vista Substation, Grand Terrace, CA. Provide the necessary supervision, labor, material and equipment to move and relocate (8) new 220kv ABB circuit breakers at vista substation.

2/3/03-4/11/03- SCE, Shuttle Substation, Lancaster, CA. Change out seven (7) each 16kv disconnects and critter wrap.

12/2002- SCE, Oak Grove Substation, Visalia, CA. Provide the necessary supervision, labor, material and equipment to perform electrical construction services within  the entire Edison system on a Time and Material basis.

12/2/2002- SCE, Victor Substation, Victorville, CA. Provide the necessary supervision, labor, material and equipment to perform electrical construction services within  the entire Edison system on a Time and Material basis.

11/2002 - SCE, El Segundo Substation, Manhattan Beach, CA. Electrical construction services within  the entire Edison system on a Time and Material basis.

9/2002 - SCE Walteria Substation, Carson, CA. Replacement of four 66KV circuit breakers, including all wiring, conductor and grounding of new circuit breakers, removal & preparation for shipping of oil filled bushings, and removal of existing substation oil lines.

2/2002 - SCE Colonia Substation, Camarillo, CA. Installation of new 66KV/16KV Bank Transformers, switches and steel deadend structures. Installation of new 16KV, 13 bay steel rack with 11 new circuit breakers, 2 new capacitor banks including vacuum switches, all control cable, control wiring, above grade conduit and grounding.

2/2002 - SCE Protein Substation, Installation of new substation, 66KV/4KV, including steel erection, installation of electrical equipment, all above grade conduit & grounding, and all control wiring. 

10/2001 - SCE Cucamonga Substation, Installation of wrap around bus, four bay 16KV bus extension, installation of bank transformer 66/16KV, 66 & 16KV circuit breakers, steel erection and all above grade conduit, grounding and control wiring.

10/2001 - SCE Eagle Mountain Group, various locations CA. Replace existing circuit breakers, voltages ranging from 16KV to 66KV. Included demolition, facilities modifications, conduit, control wiring, grounding. Close interface with customer representative and contract test crews.

12/2000 - SCE Ontario Substation, Ontario CA. Remove and replace three single phase transformers with single three phase transformer. Replace one 4KV oil filled circuit breaker with gas CIRCUIT BREAKER. Modification to copper bus on joint 12KV/4KV steel rack. Modify steel rack and replace existing disconnects in 4KV rack. Included all above grade conduit, wiring and grounding. Coordination with same tier subcontractor for inside control house wiring and outdoor civil work.

11/2000 - SCE Commodore Substation, San Pedro, CA. Complete demolition of de-energized 12KV customer substation rack. Included installation of temporary electrical service for control cubicle, demo of electrical equipment, including oil filled circuit breakers, power transformer, control transformers, potheads, get-away risers, IPS bus and steel structure. Included demolition of overhead spans from 69VK yard. Demolition of all above grade conduit and grounding. Prepared all items for shipping to salvage and refuse.

10/2000 - SCE Navy One Substation, San Pedro, CA. Complete demolition of de-energized customer substation. Included demo of electrical equipment, including oil filled circuit breakers, power transformer, control transformers, potheads, get-away risers and overhead bus. Demolition of all above grade conduit and grounding. Prepared all items for shipping to salvage and refuse.

10/2000 - SCE Mesa Substation, Monterey Park, CA. Replacement of two 69/12KV 28MVA transformers, including above and below grade conduit, grounding and control wiring. Replacement of three 12KV oil filled circuit breakers with new FS6 gas CBs. Upgrade and replace existing operating and transfer IPS bus with new 3 inch IPS, under energized conditions.

4/2000 - SCE Pauba Substation, Temecula CA. Replacement of 28MVA transformer. Modification to existing 12KV rack and installation of station light & power pole style 15KVA transformer. Includes all associated control cable, above conduit systems and grounding.

4/2000 - SCE, Pechanga Substation, Temecula CA. IPS Bus extension of 16KV rack. Included four new steel bays, installation of three new SF6 CBs, extension of 3" IPS operating and transfer buss, disconnects, get-away riser racks and associated above grade conduit systems, grounding and control wiring. Replacement of two 28MVA 115KV/16KV transformers, including all ACSR re-conductoring and control wiring.

10/1999 - 2000. SCE, Antelope Substation, Antelope Valley CA. Work included replacement of 220KV 3 phase oil filled circuit breaker. Included onsite removal CIRCUIT BREAKER bushings and preparation for transport. Attached to this work order, demolition of cooling oil pipe system, replacement of existing 69KV station light and power transformers and modifications to copper bus rack, including all above grade conduit systems, grounding and ACSR re-conductoring. Included demolition of 12KV oil filled circuit breaker.

6/1999 - Subcontract for MCS Construction Inc for SCE Lugo and Vista Substations. Work consisted of installation of above grade and below grade conduit, control cabling and termination of fuel tank sensor controls.

11/1998 - SCE, El Dorado Substation, Boulder City NV. Replacement of existing outdoor transfer switch equipment with new automated indoor transfer switch gear for station light and power. Required coordinated effort with station electricians, test and operators for the circuit by circuit transfer of station light and power circuits from existing gear to new gear.

1998 - Subcontract for E.E. Electric, Inc. on SCE Fiber Substation, Riverside, CA. Work consisted of off-site assembly and control wiring of outdoor control cubicle. 4 cubicle control cabinet, 120/240V power panel for lighting and convenient outlets, installation and wiring of all relays and preparation for SCE battery installations.

1998 - Subcontract for E.E. Electric, Inc. on Eco-tech's Mountain View Power & Riverside Canal Power Substations, San Bernardino & Riverside, CA. Work consisted of evaluation and preparation of 4160V 3 phase motor startups for boilers at steam generating plants.

1998 - SCE, Various Substations, CA. Pilot program installation of outdoor bus and apparatus insulation, Raychem and Midsun products. Included wrapping insulating tape and pre-molded insulating products on various outdoor equipment (circuit breakers, transformers, disconnects, conductor and IPS bus). Voltages of 4KV - 16KV, installed under de-energized conditions.

1997 - SCE, El Dorado Substation, Boulder City, NV.  Work included the all bus work, below and above conduit, and control wiring to replace existing 500KVA A-Bank transformer.

1996 - SCE, El Dorado Substation, Boulder City, NV. Work included the removal and replacement of high loss series capacitor units, and related bus work.